Internal metal stud and external linings to six floors installing approx 40 kilometres of partitions, with a tape and jointed finish. Inclusive of Jumbo stud partitioning to atrium walls with full height feature plasterboard panel. Lead lining to X Ray/scanner rooms, construction of 12 number operating theatres.

A close working and "partnering" type of approach was taken alongside Carillion, which enabled, detailed programming with the client and other trades allowing the works to progress in a logical sequence and to an achievable productive disciplined programme. Lafarge systems were installed and adapted to suit "value" and specific detailing; in particular "hybrid" partitions were installed and adapted to suit "value" and specific detailing. A full recycling process was initiated for plasterboard waste and metal stud off cuts.

CONTRACTOR: Carilion (special projects) | SUB-CONTRACT VALUE: £5.3m | SUB-CONTRACT PERIOD: 110 Weeks | LOCATION: Oxford

John Radcliffe Hospital 01
John Radcliffe Hospital 11
John Radcliffe Hospital 12
John Radcliffe Hospital 17
John Radcliffe Hospital 18
John Radcliffe Hospital 19